If you ride a pedal-assist mountain bike out from the Skyliners Road corridor this fall, where does it stop being legal? There are two answers: at a particular trailhead, and on a particular date. Neither one depends on how steep, rocky or crowded a trail is. Both come from where the trail starts and what the deer and elk need in winter. This year is the first time either line has applied to Phil's.
A Season That Started on April 1
The Deschutes National Forest signed its final decision on December 9, 2025. It authorizes Class 1 pedal-assist e-bikes on about 161.4 miles of 67 existing soft-surface trails and paved paths near Bend, Sisters and Sunriver. Under the decision, those routes opened to e-bikes on April 1, 2026.
The Bulletin called it the most significant rule change in the history of Central Oregon mountain biking. It also put the scale in local terms: 161 of the 320 miles of singletrack on the Deschutes National Forest west of Bend. About half of the singletrack west of town opened to e-bikes, and the open half is concentrated close to the neighborhood.
The Line Runs by Trailhead
The Bulletin reported that essentially the entire Phil's Trail network and the entire Wanoga network opened to Class 1 e-bikes. The places that stayed closed to them are the higher-elevation areas: trails out of Skyliners Trailhead, Swampy Lakes Sno-park and Dutchman Sno-park, plus the Mt. Bachelor and Cultus Lake areas. The Deschutes River Trail and Mrazek also stayed closed.
The Central Oregon Trail Alliance's e-bike page lists trails by name. The overall rule is open low and closed high, but the trail table has one exception inside the Phil's network itself.
| Route | Class 1 e-bike status |
|---|---|
| Phil's | Open |
| Ben's | Open |
| COD | Open |
| Expressway | Open |
| Grand Slam | Open |
| Kent's | Open |
| Voodoo and Voodoo Child | Open |
| Lower Whoops | Open |
| Tyler's Traverse | Open |
| Upper Whoops | Not allowed |
| Mrazek | Not allowed |
| North Fork and South Fork | Not allowed |
| SST | Not allowed |
| Tumalo Ridge | Not allowed |
The Whoops trails are the detail most likely to catch someone out. Lower Whoops is open and Upper Whoops is not, so a loop that seems to follow one trail actually crosses the line partway up. In the other direction, the routes that start at Skyliners Trailhead and the Swampy area are closed from the start: Mrazek, North Fork, SST, South Fork and Tumalo Ridge.
The Forest Service keeps an interactive e-bike map for checking a planned route segment by segment. The page was last updated April 17, 2026.
December 1 Comes From the Deer and Elk Calendar
The season ends December 1 because a habitat rule ends it. The Forest Service decision says the e-bike trails follow the Winter Range Closure Season, which prohibits e-bike use from December 1 through March 31 to protect important deer and elk habitat. That same rule explains why the first season started on April 1, a few months after the decision was signed in December.
The Tumalo Winter Range is the closure area that covers the country west of Bend. Last winter's Forest Service notice named it as one of four annual winter range closures and said motorized vehicles, including snowmobiles and e-bikes, are prohibited inside those areas from December 1 through March 31.
The rule has two consequences for this season:
- It keys on the date. The cutoff comes from habitat protection, so it applies on December 1 whatever the snow or trail conditions are.
- It covers motorized use. The closure applies to motorized vehicles, and e-bikes are named as part of that group. Under the closure language, a conventional mountain bike on the same Phil's trails is not affected. Any separate trail-specific closure still applies to everyone.
The Central Oregon Trail Alliance states the same window for Class 1 e-bikes: no use from December 1 through March 31. If the pattern holds, Phil's will open to e-bikes again on April 1, 2027.
This post is general information about public land rules, not legal advice. Before a ride, check the current Forest Service closure notices and maps.
What Counts as Class 1
The definition is narrow. In the Forest Service's words, a Class 1 e-bike provides assistance only when the rider pedals, and the assistance stops at 20 miles per hour. A bike modified beyond those limits is no longer Class 1 and is not authorized on these trails. According to COTA, as reported by The Bulletin, all other e-bike classes and e-devices remain disallowed, with an exception for adaptive bikes.
The real difference on the trail is speed on climbs. The Bulletin cited a Tahoe National Forest study that measured uphill speeds of 5 to 8 mph for regular bikes and 8 to 13 mph for Class 1 e-bikes. That gap is the main thing everyone sharing a climb at Phil's has had to adjust to this year.
Enforcement mostly relies on trail users. COTA describes its rollout as signage, education through bike shops, checks on sightlines and traffic patterns, and recruiting e-mountain bike volunteers. It says Forest Service trail rules depend largely on the honor system and that it does not want trail police.
A Rule With Supporters and Doubters
The decision passed, but the local debate continues. Speaking to The Bulletin, COTA board president Bill Lynch described what's at stake this way:
"Class 1 pedal-assist e-bike access can make the difference between enjoying mountain biking with friends and family or sitting out entirely."
Paul Thomasberg, a COTA co-founder and the main architect of the Wanoga network, told the paper that the Forest Service acted responsibly in responding to a kind of recreation the community clearly needed. In the same article, a former COTA trails program coordinator argued against the change. He said a rider's impact on the trails could rise by anywhere from 25% to double because an e-bike lets people ride farther.
COTA's case relies on experience elsewhere. It points to Madras East Hills and Redmond Radlands, which have allowed Class 1 bikes for several years, and says maintenance needs there have been similar to other systems with no rider conflicts reported. The Forest Service said in its December 2025 decision that it would keep monitoring to guide its education efforts. After December 1, the closed season will be the first winter in which the Phil's network has a full riding season of e-bike use behind it.
Before the Cutoff
Anyone who wants to try a Class 1 bike on Phil's before December 1 has a few rental options in town. The class designation matters for the reasons above, so the details are listed here:
- Cog Wild rents a Class 1, pedal-assist, full-suspension Santa Cruz Vala for $130 per day from its Bend location at 115 SW Columbia Street.
- Pine Mountain Sports lists electric mountain bike rentals at $100 for four hours or $130 per day. The listing does not state the bike class.
- Sunnyside Sports lists e-mountain bikes at $110 for an afternoon or $150 for 24 hours. The listing does not state the class.
- Bend Electric Bikes lists demo eMTB rentals at $100 for four hours, $110 from 10 a.m. to 5 p.m., or $130 for 24 hours. The listing does not state the class.
For the last three, confirm the bike is Class 1 before heading to Phil's. Early in the season, BendR Cyclery and owner Will Priest ran an e-MTB demo at Phil's Trailhead to teach riders the new access rules and trail etiquette, as Central Oregon Daily reported.
One more current closure affects routes west of the neighborhood. Since October 2, the Forest Service has closed Tumalo Ridge Trail from Swede Shelter north to Forest Road 4601-434 for thinning and mastication, seven days a week, with no end date posted. That trail was already closed to e-bikes. The same alert lists Phil's Trailhead among the affected recreation sites without closing it. It also warns that log hauling continues west of Bend and asks everyone to use caution at temporary haul-route and road crossings.
Knowing exactly where a line falls is also useful off the trail. If you're weighing a move within Tree Farm or nearby west side neighborhoods and want that level of detail about the property, Silvia Linda Giffin Knight is glad to talk it through. Schedule a confidential consultation.